Professional Career
CBRE
-
Johnson & Johnson, Prague; 2016-2018
Office fitout in Mechanica 1 building for Johnson & Johnson.
- Project phases and positions held:
- Concept design, building permit design, construction documents, construction, commissioning – Tenant representation, management of tenant's direct deliverables.
- Position held: project manager.
AED project
-
Top rezidence Šárecké údolí, Prague; 2013-2015
New housing development of 50 family houses
- Project phases and positions held:
- Planning permit, building permit, bidding – technical coordination of infrastructure and outdoor spaces.
- Construction documents and construction supervision – technical coordination of infrastructure and outdoor spaces, cooperation with the architect on architectural design of two buildings and outdoor spaces of the housing development.
- Position held: responsible engineer.
-
Embassy of Turkey in Prague; 2011-2014
New embassy building
- Project phase: planning permit.
- Position held: lead engineer.
- Key duties: management of the team of local engineers, communication with the architect from Turkey (Emre Arolat Architects) and with the embassy, technical coordination, cooperation with the architect on architectural drawings, assistance to permitting.
-
Embassy of the Czech Republic in Washington, DC; 2012-2013
New embassy building
- Project phase: pre-feasibility study, schematic design.
- Position held: architect’s project manager.
- Key duties: coordination of the team of architects and engineers, elaboration and update of the project time schedule, communication with US design firms during the tender for the local architect (e.g. Arup, Buro Happold atd.), communication with the Czech Ministry of Foreign Affairs.
-
Faculty of Humanities, Charles University, Prague; 2010-2011
Transformation of a former catering facility into the main building of the Faculty of Humanities
- Project phase: planning permit.
- Position held: designer / engineer.
- Key duties: technical coordination, cooperation with the architect on the architectural design.
-
Fórum Karlín (Karlín Hall 1 and 2), Prague; 2010
Transformation of the Kotlárna assembly hall in Karlín into a newsroom for Economia publishing and a new office building with a multi-use / concert hall
- Project phase: feasibility study.
- Position held: designer / engineer.
- Key duties: assessment of technical and land use aspects of the location.
-
Smíchov Railway Station, Prague; 2009-2010
Urban study for a change of the Land Use Plan
- Project phase: urban study.
- Position held: designer / engineer.
- Key duties: technical coordination.
-
Neugraf (Residence Grafická), Prague; 2009
New residential building to replace a former printing plant in Prague 5
- Project phase: Schematic design as a basis for EIA.
- Position held: designer / engineer.
- Key duties: technical coordination, cooperation with the architect on the architectural design.
-
Jindřich Plaza Ostrava; 2007-2009
A pair of two high-rise buildings – an office building and a Marriott hotel
- Project phase: planning permit, building permit, bidding.
- Position held: designer / engineer.
- Key duties: technical coordination, cooperation with the architect on the architectural design of the office building.
Deltaplan
-
Mixed Use Development U Hájků, Prague; 2006
Remodeling of an existing building and addition of a new building
- Project phase: construction documents.
- Position held: designer.
- Key duties: cooperation with the design team on specifications.
-
Assembly Hall Sipral Jirny; 2006
New assembly hall for Sipral
- Project phase: building permit.
- Position held: designer.
- Key duties: cooperation with the design team on architectural drawings.
|